-
Use the rotary switch 5 to select the required function mA
-
If necessary, press the ZERO key 6 for 2 seconds to enable the low-pass filter (LPF).
-
Press the "ZERO" button 6 to set the BENNING CM 9-1 to the starting point.
-
Operate opening lever 4 , clamp 1 single wire live conductor centrally by means of the
BENNING CM 9-1 current probe.
-
Read off the digital display unit 9 .
8.3.1
Leakage current measurement at the ground conductor
See figure 4:
Leakage current measurement at the ground conductor
8.3.2
Differential current measurement at single-phase systems
See figure 5:
Differential current measurement at single-phase systems
8.3.3
Leakage current measurement via ground conductor (charge eliminator) for three-
phase supply
See figure 6:
Leakage current measurement via ground conductor (charge eliminator) for
three-phase supply
8.3.4
Differential current measurement, load supplied in three-phase, without N-type
conductor
See figure 7:
Differential current measurement, load supplied in three-phase, without N-type
conductor
8.3.5
Differential current measurement, load supplied in three-phase, with N-type
conductor
See figure 8:
Differential current measurement, load supplied in three-phase, with N-type
conductor
8.3.6
Alternating current measurement
See figure 9:
Alternating current measurement
8.4 Resistance measurement
-
Select the function
-
The black safety measuring lead has to be contacted with the COM jack J on the BENNING
CM 9-1.
- Connect the red safety measuring lead to the V-Ω jack K , marked in red.
-
Bring the safety measuring leads into contact with the measuring points, read off measured
value on the digital display 9 on the BENNING CM 9-1.
Note:
-
To obtain a correct measurement, ensure that no voltage is applied to the measuring point.
See figure 10:
Resistance measurement
8.5 Continuity testing with buzzer
-
Use the rotary switch 5 to select the required function
press the „PEAK" key 7 .
-
The black safety measuring lead has to be contacted with the COM jack J on the BENNING
CM 9-1.
- Connect the red safety measuring lead to the V-Ω jack K , marked in red.
-
Apply the safety measuring leads to the measuring points. If the resistance between the
measuring points falls below approx. 45 Ω, the integrated buzzer of the BENNING CM 9-1
sounds.
See figure 11:
Continuity testing with buzzer
9.
Maintenance
Before opening the BENNING CM 9-1, make sure that it is free of voltage!
Electrical danger!
Work on the opened BENNING CM 9-1 under voltage may be carried out only by skilled
electricians with special precautions for the prevention of accidents.
Make sure that the BENNING CM 9-1 is free of voltage as described below before opening the
instrument:
-
First, remove the BENNING CM 9-1 and the two safety measuring leads from the measuring
object.
-
Then disconnect the two safety measuring leads from the BENNING CM 9-1.
-
Turn the rotary switch 5 to the switch setting "OFF".
The BENNING CM 9-1 is not equipped with a fuse.
10/ 2020
by means of the rotary switch 5 of the BENNING CM 9-1.
BENNING CM 9-1
or A
on the BENNING CM 9-1.
on the BENNING CM 9-1 and
25