Télécharger Imprimer la page

SAMES KREMLIN SEGUIN 3000 Manuel D'utilisation page 81

Masquer les pouces Voir aussi pour SEGUIN 3000:

Publicité

Les langues disponibles

Les langues disponibles

Use of the product
9.4 Shutdown procedure
Pump
582131110-2B0225-indA-EN.docx
To avoid the risk of personal injury, material injections,
injuries caused by moving parts or electric arcs, it is
imperative that the following procedure be followed
before any work is carried out when shutting down the
system, assembling, cleaning or changing the nozzle.
 Lock the guns (valve, tap...) on OFF.
 Shut off the air supply through the shut off valve to remove
residual air from the motor.
 Unlock the gun (valve, tap...).
 Bring the gun (valve, tap...) close to a metal bucket in order
to recover the product. Hold it against the wall of the
bucket to avoid interrupting the grounding continuity (if
necessary, use the wire with clamp to ground the metal
bucket).
 Open the gun (valve, tap) in order to drain the circuit.
 Lock the gun (valve, tap) in the OFF position.
 Open the pump drain valve and collect the fluid in a
properly grounded metal pail.
 Leave the bleed valve open during the entire operation.
Check the conformity of the wiring before intervention.
27/10/2020
31

Publicité

loading

Ce manuel est également adapté pour:

146310000