INSTALLATION
The Fuave ACB12K01 en ACB14K01 are portable air conditioners/
dehumidifiers that can be moved from room to room. Install as follows:
•
Remove all packaging material, keep it away from childeren and ensure
that the unit remains in an upright position.
•
Before use, check that all accessories are present and that there is no
damage to the accessories or the unit itself. Do not use a damaged unit;
take it back to your supplier!
•
Place the unit on a sturdy, flat, dry and horizontal base near an electrical
socket and a discharge point for hot air, e.g. a window that can be
opened slightly. Make sure that the unit has at least 30 cm of free space
on all sides and take all safety instructions into account.
•
To use the dehumidification function, connect the water drainage hose
to the water drainage point (9). This hose should lead to a bucket or
drain. The hose should not run upwards! Your unit is now ready for use.
Dehumidification
•
To use the dehumidification
function, connect the water
drainage hose to the water
drainage point (9). This hose
should lead to a bucket or
drain. The hose should not run
upwards! Your unit is now ready
for use.
2 6
All manuals and user guides at all-guides.com