Tools Required - Sentiotec HIMALAYA SMALL INFRA+ Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installations for instructions

1.2. Tools required

● Hammer with a wooden head or a mallet
● Cordless screwdriver with bits for cross-head screws and Torx
● Roller tape measure
● Drill bits with a diameter of 3 mm, 10 mm, 20 – 30 mm (for sauna heater
power cable)
● Spirit level
● 1.5 mm hexagonal socket wrench
● Utility knife
● Ladder
This symbol indicates tips and useful information
Back-to-front assembly
Pre-drill
Check the right angle:
80 cm
Handle glass with care: Special care must be taken with the edges of
the glass – hardened glass can shatter into small pieces in the event of
impact. Insert protective cushioning (e.g: cardboard box) under the edge
of the glass.
p. 4/12

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1-052-962

Table des Matières