Preparation For Assembly; Tools Required; Assembly Illustrations - Sentiotec Onni Mini Manuel D'utilisateur

Cabine infrarouge
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
Instructions for installation and use

4. Preparation for assembly

Before you begin work, check the parts list to ensure that all the individual parts
have been delivered. If you discover any missing parts, notify your dealer within
14 days of receiving the sauna cabin.
You need an assistant for assembly.
We also advise you to pre-drill the holes for the screws
Check the right angle:
80 cm
Handle glass with care: Special care must be taken with the edges of
the glass – hardened glass can shatter into small pieces in the event of
impact. Insert protective cushioning (e.g: cardboard box) under the edge
of the glass.

Tools required

Screwdriver
Twist drill bit
Spirit level

5. Assembly illustrations

(following the last language of the instructions)
Tape measure
Utility knife
Pencil
page 11
p. 7/10
EN
Drill
Step ladder

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1-053-078

Table des Matières