Assembly
Step 7:
Into each top part of the stand
and secure it with a screw
Use spanners for this.
Select the grid height here that comes closest
to the distance between the ceiling and the
floor, which you have you defined/measured in
Step 1.
Step 8:
Attach the hand crank
9
and screw tight.
Step 9:
Attach the clamp awning from above left and right to the
height adjuster
5
.
Temporarily tighten the clamp awning.
40
4
, insert a height adjuster
14
and nut
15
.
to the pre-mounted clamp awning
5
5
4
5
5
14
15
4
9
5
V1/2021-30314