American Standard Ovation Curve AM00843400 Manuel Du Propriétaire page 8

Portes de douche en alcôve
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3
INSTALLING TOP RAIL
• In this step, you'll need following part: [18] x1
• In this step, you'll need the following tools: A, M
[18]
3a. Slide Top Rail [18] over and into Left [3] and Right Wall Bracket [4], (check for level) then slide metal piece
over Top Rail and into the wall bracket as illustrated.
Each Wall Bracket has a metal piece with 2 set screws that slide on top of the bracket. This will need
!
to be removed so that the Top Rail [18] can be installed. After removed, Slide Top Rail [18] over and
into Left [3] and Right Wall Bracket [4]. Check that Top Rail is level, then slide metal piece over Top
Rail and into the wall bracket as illustrated.
3b. Using supplied 2.5 mm Allen Key, tighten set screw on the bottom of Wall Bracket [4].
3c. Using supplied Allen Key, tighten 2 set screws on top of Wall Bracket to securely hold Top Rail [18]
in place.
3d. Proceed to tighten set screws on the opposite side.
3a
3c
VIEW FROM INSIDE
3b
3d

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ovation curve am00844400Ovation curve am00845400

Table des Matières