Installation & Mounting; Mounting; Fixing The Supports - Rointe Z Serie Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2. INSTALLATION & MOUNTING
The radiator must never be installed immediately below a power point.
In bathrooms, the radiator must never be installed where the switches and other devices may
be within the reach of someone in the shower or bathtub.

2.1. Mounting

The Z SERIES radiator works by means of natural air convection (Figure 1). In order to achieve
optimal functioning and an even distribution of heat, the lower part of the radiator, once
mounted on the wall, must be at least 10 to 12 cm from the floor, and 30 cm at the most.
As for the sides and above, a minimum distance of between 10-12 cm must be left from any
wall or brickwork in order for it to function correctly (Figure 2).
Fig. 1
2.1.1.  Fixing the supports
Inside the packaging you will find a fixing kit, where you will find support.
• Choose the right part of the wall.
• Place the mounting stencil on the wall, marking the places for the holes.
• Remove the stencil and make the holes in the wall.
• Fix the supports using the plugs and screws provided, or others suitable for the
wall type.
• Place the radiator in the supports.
Minimum
10 cm.
Minimum
10 cm.
Minimum
10 cm.
Minimum
10 cm.
Fig. 2
23

Publicité

Table des Matières
loading

Table des Matières