Installation And Mounting; Mounting - Rointe KN-615 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2. INSTALLATION & MOUNTING
The radiator must never be installed immediately below a power point.
In bathrooms, the radiator must never be installed where the switches and other devices
may be within the reach of someone in the shower or bathtub.

2.1. Mounting

The K SERIES radiator works by means of natural air convection (Figure 1). In order to
achieve optimal functioning and an even distribution of heat, the lower part of the radiator,
once mounted on the wall, must be at least 10 to 12 cm from the floor, and 30 cm at the
most.
As for the sides and above, a minimum distance of between 10-12 cm must be left from any
wall or brickwork in order for it to function correctly (Figure 2).
FIGURE 1
Fixing the supports. Inside the packaging you will find a fixing kit and in the base of the
radiator you will find a security support.
1. Choose the right part of the wall.
2. Place the mounting stencil on the wall, marking the places for the holes.
3. Remove the stencil and make the holes in the wall.
4. Fix the supports using the plugs and screws provided, or others
suitable for the wall type.
5. Place the radiator onto the supports.
6. Tighten the two screws housed within the underneath of the security
support using the key sent with the product. These tighten the security
clamps (Figure 3).
FIGURE 2
10 cm
minimum
10 cm
minimum
10 cm
minimum
FIGURE 3
10 cm
minimum
17

Publicité

Table des Matières
loading

Table des Matières