ELECTRICAL CONNECTIONS

The three-phase power supply line
must have a switch with fuses.
The regulations further require
a switch on the burner's power
supply line, outside the boiler
room and in an easily accessed
position. For the electrical con-
nections (line and thermostats),
follow the wiring diagram enclo-
sed. To carry out the connection
of the burner to the power supply
line proceed as follows:
1) Remove the lid by unscrewing
the 4 screws (1) in figure , without
removing the transparent door.
In this way the burner's electrical
panel can be accessed. .
2) Slacken le screws (2) and,
after removing the cable float
(3), pass the two 7 and 4 pole
plugs through the hole (see figu-
re 2). Connect the power sup-
ply cables (4) to the contactor,
connect the cable to ground (5)
and close the cable holder.
3) Reposition the cable float as in
figure 3. Turn the cam (6) so that
the float exerts sufficient pres-
sure on the two cables, then ti-
ghten the screws that fasten the
cable float. Finally, connect the
two 7 and 4-pole plugs.

IMPORTANT:

the housings for the cables for
the 7 and 4-pole plugs are provide
respectively for cable Ø 9.5÷10
mm and Ø 8.5÷9 mm, this to
make sure the protection rating
is IP 54 (standard IEC EN60529)
for the electrical panel.
4) To reclose the electrical panel
lid, tighten the 4 screws (1) with
a torque of about 5 Nm to ensu-
re the correct seal. At this point,
to be able to access the control
panel (8), unfasten the transpa-
rent door (7), using slight touch
pressure in the direction of the
arrows in figure 4, move it the
short distance to separate it
from the lid.
All manuals and user guides at all-guides.com
5) to
properly
transparent door on the panel
proceed as indicated in
position the hooks at their
hooking points and (9) slide the
door in the direction indicated by
the arrow until it clicks. It is now
well sealed.
45 / 119
0006081062_200709
resecure
the
5:
Fig.1
Fig. 2
Important:
only qualified technicians may
open the burner's electrical pa-
nel.
Fig.3
Fig.4
Fig. 5

Publicité

Table des Matières
loading

Table des Matières