Télécharger Imprimer la page

R&G CP0256BL Instructions De Montage page 2

Publicité

Les langues disponibles

Les langues disponibles

Left-hand side (as you sit on bike)
Remove left-hand side fairing.
Remove the engine bolt arrowed below. DO NOT REMOVE THE SPACER.
Offer up the metal block with L-H engraved on the flat (top) surface into position shown above
left, the spigot will sit in the recess where the OEM bolt used to be and the semi-circular cut-out
will fit over the frame.
Fit the longer of the two M10 CAP HEAD BOLTS with washer through metal block into threaded
engine mount and lightly tighten.
Slip one of the half round clamps behind frame and under wiring to line up with smaller holes in
metal block, using two of the longer M6 cap head bolts with washers through the metal block to
secure and tighten clamp.
Tighten larger cap head bolt.
Screw marking tool (threaded bar with pointed end) into threaded hole in block with point sticking
out by approximately 25mm.
Offer fairing up to bike being careful not to damage fairing with marking tool, fix in position
using fairing screws on front half of fairing, locate rear half of fairing to fairing mounting holes,
the marking tool should now be unscrewed by approximately another 10mm so it just contacts the
inner face of fairing when all fairing screws are tight.
Gently push on fairing directly over marking tool until the inner face of fairing is marked enough
to allow drilling of a pilot hole.
Remove fairing and using mark from marking tool drill pilot hole from inner face of fairing
outwards.
Offer fairing back up and check pilot hole lines up with point of marking tool.
Remove fairing and drill hole using a 28mm hole-saw, use pilot hole and drill from outside
inwards.
Remove marking tool.
Deburr using sharp knife or deburring tool being careful not to mark fairing.
Refit and tighten fairing.
Place washer and shake-proof washer from kit onto the hex head bolt from kit (ensure plain
washer is against bolt head and shake-proof washer will be against bobbin face on assembly), fit
through bobbin so bolt head goes into counter-bore.
Unit 5K, Blacknest Industrial Park, Blacknest Road, Alton, Hampshire, GU34 4PX
Tel: +44 (0)870 220 6380 Fax: +44 (0)1420 521101
R&G Racing
www.rg-racing.com
Email:
info@rg-racing.com

Publicité

loading