Before Using The Tester; Switching On / Off The Tester / Auto Power Off - Beha-Amprobe 2100-Delta Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 37
• For all work, observe the accident prevention regulations of
the professional trade association for electrical installations
and equipment and/or other local safety regulations.
• Unauthorized persons shall not disassemble or assemble
the voltage tester and supplementary equipment. The
voltage tester may be serviced by an Beha-Amprobe
authorized service technician only.
• Operational safety is no longer guaranteed if the voltage
tester is modified or altered.
• The current test can also be performed on single insulated
wires and uninsulated conductors or busbars. In the
case of non double insulated wires, it is necessary to pay
outmost attention not to touch the wire and keep distance
to avoid electric shock.
• Use only specified replacement parts.
• Remove batteries to prevent battery leakage and damage
to the Product if it is not used for an extended period.

Before Using the Tester

W
Before conducting any test, follow the safety instructions.
Before using the voltage tester, always perform a function test.
W
Disconnect the voltage tester completely from any
measuring circuit first.
The "GS 38 protective cap"
the tests. To do this, pull them forward off the test probes.
W
The "GS 38 protective cap"
national regulations or directives.

Switching ON / OFF the Tester / Auto Power OFF

Auto-Power-ON/ switching ON
The tester switches on automatically when it detects shorten
test probes (continuity), or an AC or DC voltage above approx.
6 V or a live phase on L2+ probe (single pole phase test).
Alternatively, the tester can be switched on by pressing ON/
OFF button
7
Auto-Power OFF / switching OFF
Tester is automatically powered OFF after approx. 30 sec
when there is no signal contacted to the test probes.
The flashlight automatically switches OFF after approx. 30 sec.
Alternatively, the tester can be switched OFF by pressing the
ON/OFF button for 5 sec.
Function Test/Self-Test:
Switch ON voltage tester by shorting the test probes, while
unit is OFF. All LEDs, flashlight, buzzer, vibration, all symbols
on LCD and backlight shall be on for approx. two seconds
Note: Self test will be also performed automatically after
battery replacement.
If the Low Battery symbol blinks after the self test is
performed, the batteries must be changed.
Before and after use, always test the voltage tester on a known
voltage source or on a proving unit.
W
The voltage tester must be no longer used if one or more
functions fail or if no functionality is indicated.
W
Remove discharged batteries immediately from the voltage
tester to prevent any leaks.
The ELV LED
voltages > 50 VAC / 120 VDC.
W
CAUTION: All other indications will not work without
batteries or discharged batteries.
or "Flashlight/HOLD" button
18
functions even without batteries at
13
can be removed before
13
may be required by
6
8
.

Publicité

Table des Matières
loading

Table des Matières