Before You Start; Assembly - Shindaiwa EB2510 Manuel D'utilisation

Masquer les pouces Voir aussi pour EB2510:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Before you start

Assembly

Read the operator's manual carefully to ensure that you assemble the product correctly.
Never perform maintenance or assembly procedures with engine running.
Using a product that has been incorrectly assembled could lead to an accident or serious injury.
Install blower pipes
1. Blower pipe
1. Nozzle
3. Locking pin
Remove blower pipes
1. Blower pipe
WARNING
2. Locking pin
2. Blower pipe
Before you start
Place the blower upright on the ground or on a sturdy work sur-
face.
1.
Grasp the blower pipe and push the pipe over the blower dis-
charge port and locking pins.
2.
Lock the blower pipe to the blower discharge port by rotating
the pipe until the locking pin snaps into place.
3.
Grasp the nozzle with the mark "THIS SIDE UP" (A) posi-
tioned and then push the nozzle over the blower pipe and
locking pins.
4.
Lock the nozzle to the blower pipe by rotating the nozzle.
(Mark "THIS SIDE UP" must face up)
IMPORTANT
Blower pipe installation affects both blower balance and per-
formance. The pipe and nozzle are correctly installed when the
mark "THIS SIDE UP" is visible to the operator during normal
operation.
1.
To detach the blower pipe, push the locking pin in and rotate
pipe anticlockwise. The hex wrench can be used.
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eb3410

Table des Matières