Qlima PES 7125 Manuel D'utilisation page 89

Masquer les pouces Voir aussi pour PES 7125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 52
required, for handling refrigerant cylinders;
d)
All personal protective equipment is available and being used correctly; the recovery process is
supervised at all times by a competent person;
e)
recovery equipment and cylinders conform to the appropriate standards.
f)
Pump down refrigerant system, if possible. g) lf a vacuum is not possible, make a manifold so
that refrigerant can be removed from various parts of the system. h) Make sure that cylinder is
situated on the scales before recovery takes place.
i)
Start the recovery machine and operate in accordance with manufacturer's instructions.
j)
Do not overfill cylinders. (No more than 80 % volume liquid charge).
k)
Do not exceed the maximum working pressure of the cylinder, even temporarily.
l)
When the cylinders have been filled correctly and the process completed, make sure that the
cylinders and the equipment are removed from site promptly and all isolation valves on the
equipment are closed off. m) Recovered refrigerant shall not be charged into another refrigeration
system unless it has been cleaned and checked.
10 LABELLING
Equipment shall be labelled stating that it has been de-commissioned and emptied of refrigerant. The
label shall be dated and signed. Ensure that there are labels on the equipment stating the equipment
contains flammable refrigerant.
11 RECOVERY
When removing refrigerant from a system, either for servicing or decommissioning, il is recommended
good practice that all refrigerants are removed safely. When transferring refrigerant into cylinders, ensure
that only appropriate refrigerant recovery cylinders are employed. Ensure that the correct number of
cylinders for holding the total system charge are available. All cylinders to be used are designated for the
recovered refrigerant and labelled for that refrigerant (i.e. special cylinders for the recovery of refrigerant).
Cylinders shall be complete with pressure relief valve and associated shut-off valves in good working
order. Empty recovery cylinders are evacuated and, if possible, cooled before recovery occurs.
The recovery equipment shall be in good working order with a set of instructions concerning the
equipment that is at hand and shall be suitable for the recovery of flammable refrigerants. In addition, a
set of calibrated weighing scales shall be available and in good working order. Hoses shall be complete
with leak-free disconnect couplings and in good condition. Before using the recovery machine, check
that il is in satisfactory working order, has been properly maintained and that any associated electrical
components are sealed to prevent ignition in the event of a refrigerant release. Consult manufacturer if in
doubt.
The recovered refrigerant shall be returned to the refrigerant supplier in the correct recovery cylinder, and
the relevant Waste Transfer Note arranged. Do not mix refrigerants in recovery units and especially not in
cylinders.
lf compressors or compressor oils are to be removed, ensure that they have been evacuated to an
acceptable level to make certain that flammable refrigerant does not remain within the lubricant. The
evacuation process shall be carried out prior to returning the compressor to the suppliers. Only electric
healing to the compressor body shall be employed to accelerate this process. When oil is drained from a
system, il shall be carried out safely.
GB
89

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pes 7225

Table des Matières