Installation Procedure - Elvox EI30 Mode D'emploi

Actionneur enterré pour grilles avec portes à battants
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION PROCEDURE

Establish where the operator is to be installed
.
Prepare the sheath for laying
the power cable
.
Execute the splice of the cable
one watertight box
Watertight box
Sheathing
Place the operator into the hole, position and level it so that there
is a distance of 85mm (see pict.) between ground level and the
gate wing, cement firmly and wait for it to dry before assembling
the levers.
Insert and fasten the
lever on the toothed pi-
nion of the operator
Fix the bracket to the
gate, then to the lever
with the seeger and wa-
sher.
EI30
75mm
min
Gate
Lever
9/28
85mm
min
bracket
Washer
Seeger
GB

Publicité

Table des Matières
loading

Table des Matières