INSTALLATION
1. Locate both hanger brackets included in the kit (item 2, figure 1). Install U-bolt and chain from your Weight Distribution Kit
on each hanger bracket as shown in figure 3 (if installing Dual Cam HP on an existing weight distribution kit, the U-bolts and
chains will need to be removed from each spring bar before they can be installed on the hanger brackets).
The U-bolts must be installed in the ends of the chains (last link) as shown in figure 3.
2. Install 2 lock nuts per U-bolt, tighten u-bolt nuts. Make sure at least 2 threads are showing past the ends of the nuts.
3. Using a grease pencil or suitable marking device such as a marker and a straight edge locate and mark the center of the hitch
ball on the coupler both horizontally and vertically as shown in figure 4 . This reference point will be used to locate the cam
arm assembly position.
3. This cam arm adjustment should be centered from the factory however double checking this measurement will reduce later
adjustment. Approximately 2" of threads on either side of the yoke will be centered for initial set up. The locking nut
(bottom nut) will come loose from the factory and adjustment will be made by turning the adjustment nut (top nut). If the
adjustment is difficult, as the adjustment nut must be turned by hand, apply a small amount of light penetrating oil such as
WD40 or PB Blast to the threads of the cam arm. Work the adjustment nut back or forward to get the penetrating oil into the
threads until the adjustment nut moves freely to the desired position.
©
2010 Cequent Performance Products, Inc.
Installation Instructions
REESE Dual Cam HP
High-Performance Sway Control
Figure 5
Sheet 2 of 8
Figure 3
Mark both sides of the coupler.
Figure 4
26002IN
07-30-10
Rev. H
Form: F205 Rev A 5-6-05