Inserting the Fronius SolarCity Card into the inverter
Safety
Requirements for
installing the Fro-
nius SolarCity
card into the in-
verter
Only one Fronius SolarCity card per inverter!
38
WARNING! An electric shock can be fatal. Danger from grid voltage and DC volt-
age from solar modules.
-
The connection area should only be opened by a licensed electrician.
-
Never work with live wires! Prior to all connection work, make sure that the
AC and DC wires are not charged.
-
All electrical installations must be carried out in accordance with the National
Electrical Code, ANSI/NFPA 70, and any other codes and regulations appli-
cable to the installation site.
-
For installations in Canada, the installations must be done in accordance with
applicable Canadian standards.
WARNING! An electric shock can be fatal. Danger from residual voltage from ca-
pacitors.
You must wait until the capacitors have discharged. Discharge takes 5 minutes.
NOTE! Follow general ESD precautions when handling option cards.
WARNING! Danger of personal injury or property damage due to electric shock
or flash over. A Fronius SolarCity card and a Fronius Com card may never be op-
erated simultaneously in one device.
If necessary, remove the Fronius Com card before installing a Fronius SolarCity
card.
NOTE! A Fronius Solar City card cannot be combined with the following compo-
nents because the Fronius SolarCity card operates in a similar fashion to a data-
logger:
-
Fronius Datalogger pro card or box
-
Fronius Datalogger easy card or box
-
Fronius Datalogger & Interface box
-
Fronius Datalogger Web
-
Fronius Personal Display DL
-
Fronius Datamanager
-
Fronius Datamanager 2.0 / Fronius Datamanager Box 2.0
NOTE! When installing the Fronius SolarCity card into the inverter, you should
follow all relevant information in the inverter operating instructions especially the
safety rules.