Installation; Unpacking The Product - Riello RPS 25/4 200 Instructions Pour L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8

INSTALLATION

5 UNPACKING THE PRODUCT

The systems
R
RPS 25/4 arrive on a single pallet and differ
based on the number of collectors and the capacity of the solar
storage cylinder.
Pallet contents:
− Individually packaged collectors with data plate
− Double-coil solar storage cylinder with internal glazing
and solar station (equipped with solar regulator) pre-fit-
ted
− Anti-freeze liquid, contained in a cannister
− Expansion tank
The following items are supplied in a cardboard box:
− Fittings
− Thermostatic mixer valve
− Bracket for installation of the expansion tank
The following items are delivered in a plastic bag inside the
packaging:
− Instruction booklets and hydraulic test certificate
− Bar code label
− Serial number plate
− Energy label.
9
Be careful not to lose the two flat gaskets (1) in the corner (2)
of each collector.
9
The instruction booklets are an integral part of the system
RPS 25/4 and there it is recommended that they are read
carefully and kept in a safe place.
9
STORE IN A DRY PLACE AND DO NOT EXPOSE TO DIRECT SUNLIGHT
UNTIL THE TIME OF INSTALLATION! The packaging is not de-
signed to protect the product against rain or humidity. It can
also degrade if exposed to direct sunlight. Failure to comply
with these precautions could lead to irreparable damage to
the product.
9
A protective film is applied on the collector glass, gener-
al and handling information is written on it. It must be
removed after the installation of the solar collector, only
when the operation of the system is required.
2
2
Description
Solar collectors
Storage cylinder capacity
Propylene glycol
Solar station
Fittings kit
Solar controller
Expansion vessel
Thermostatic mixer valve
The delivery includes accessories, the bracket system for a par-
allel roof or a flat roof, contained in cardboard boxes, and the
longitudinal members whose length depends on the number of
collectors to be installed.
Installation
7
INSTALLATION
1
RPS 25/4
200
300
1
2
200
300
10
10
1
1
1
1
1
1
18
18
1
1
l
l
l

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rps 25/4 300

Table des Matières