Operation; Preparing For Use - Tineco A10 Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Operation

Preparing for Use

Note:
• Before the first use, please charge the appliance (see "Charging the Battery") for 3-4 hours in an area
where the ambient temperature is between 39.2°F (4°C) and 104°F (40°C).
• Select an accessory and attach it to the appliance before use (see "Accessories").
Pull the trigger to activate the suction.
Pull the trigger lock to hold the trigger for
continuous power mode.
• Place the appliance on the wall-mounted dock for convenient storage and recharging after use.
Place the main body on the dock.
29
MAX
Press the MAX button to switch between
regular mode (regular power) and MAX
mode (max power).
To avoid bristle damage, always place
attachments on the dock after use.
MAX

Publicité

Table des Matières
loading

Table des Matières