Operation; Preparing For Use - Tineco ifloor BREEZE Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation

Preparing for Use

Before first use, please charge the appliance for 4-5 hours (refer to "Charging Instructions" for details).
* Based on results from Tineco lab tests. Lab temperature 39.2°F (4°C) ~ 104°F (40°C).
Stop Working
Start Again
Note:
• Do not vacuum foamed liquid.
• To vacuum water left on the surface, the appliance will switch off in 3 seconds after power off.
Press
to turn on the appliance and press it again to
turn off.
Press
to use Max water flow and the indicator blinks
blue light.
The appliance will stop working when put uprightly and
start running again when you recline.
* Do not recline more than 142° to protect against water
leakage.
Place the appliance on the storage tray vertically after use.
8

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières