SCS Sentinel SCS G Manuel D'installation Et D'utilisation page 37

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. As Fig.7, slide the end rail into the 1st sleeve, slide the middle rail
into the 1
2. As Fig.8, slide the 2
slide the top rail into the 2
3. Remove the plastic film on the end rail , cut the plastic cable tie
on the screw rod "A";
4. As Fig.9, pull the screw rod "A" along with inner chain to the end
of top rail ;
5. As Fig.10, undo the nut & spring;
6. Tight the nut to the right position as shown in Fig.11, cut the plastic
cable tie on sprocket, then whole rail assembled finished.
EN ::: 8
sleeve;
st
sleeve to the other end of middle rail,
nd
nd
Fig. 10
19MM
Fig. 11
sleeve;
B

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières