Unpacking Instructions
Take off first layer of EPS foam packaging, and
1
next remove the DSB.
3
Attach control knobs by pushing straight in,
lower aluminum burners and grate into position.
• Dispose / recycle all packaging materials.
• Verify all the contents in the box and gather the required tools. See "Parts Supplied" and "Tools Needed" list.
(2) control knobs and (2) Aluminum burners
2
are packaged seperately inside main box.
www.newageproducts.com
9