Read this installation manual completely to ensure proper installation, then file it

Installation

with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
IS
T H
E
S ID
until you obtain the missing parts.
U P
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eye/face wash should be "ON" at all times. Provisions shall be made to prevent
unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under "Products"
on our web site at www.bradleycorp.com.
Installation
Supplies Required:
• (3)
" floor anchors and bolts
3
8
• Pipe sealant
• Sign-mounting hardware
Step 1: Secure base to floor
1 .
Install three suitable anchors (supplied by installer) for
2 .
Bolt the base to the floor anchors using
Step 2: Assemble eye/face wash
1 .
Assemble eye/face wash components as shown on page 4
• Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.
• Use the rubber grip pad provided or a strap wrench around pipes when tightening to prevent marring the Bradtect®
protective, safety yellow coating. Place the grip pad on the pipe, then put the wrench over the grip pad and turn the
pipe with the wrench.
Step 3: Connect water supply
1 . C
onnect the water supply piping (supplied by installer) to the ½" NPT inlet on the eyewash.
2. Connect the drain piping (supplied by installer) to the 1¼" NPT drain outlet on the eye/face wash.
3. Mount the safety sign to the wall using sign-mounting hardware (supplied by installer).
2
IMPORTANT!
• Piping to ½" NPT water supply inlet
• Piping to 1¼" NPT drain outlet
3
" bolts (supplied by installer).
3
8
1/13/2014
" bolts in the floor .
8
.
Bradley • 215-155 Rev. X; ECN 14-05-001
Installation