Installation - Bradley S19-280D Installation

Masquer les pouces Voir aussi pour S19-280D:
Table des Matières

Publicité

S19-280D, -280W, -290D, -290W, 274HDB, 274HWB, 274JDB, 274JWB

Installation

Halo eye/face wash unit is shown on a sample 27" (686mm) deck. Other units are similar.
Minimum dimensions necessary to contain splashing from Halo units are shown.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints. The top of the eyewash heads should be positioned
a minimum of 33" (838mm) and a maximum of 45" (1143mm) from the floor and 6" (152mm) from the nearest obstruction.
Proper faucet shank/handle
clearance and recommended
minimum splash containment
dimensions must be considered
when selecting the desired
location for mounting.
27"
(686mm)
Connect the water supply using
C
piping (supplied by installer) with
½" NPT female threaded end.
6
A
Shown in the
"ON" position
Slowly open the water
supply lines to relieve air
E
and pressurize the valve.
Test the unit for leaks
and adequate flow.
3/27/2013
Ø ⁷⁄₈"
1¼"
(32mm)
Ø ³⁄₁₆"
¼"
(6mm)
Deck Mounting Pattern
Drill (3) holes as shown.
Shown in the
"OFF" position
2½"
3¾"
(64mm)
(95mm)
Min.
Ref.
Bradley • 215-1740 Rev. B; ECN 13-05-014
Installation
B
Deck
15¹⁄₈"
(384mm)
Ref.
19¼"
(489mm)
Ref.
2¹⁄₈"
(54mm)
Min.
D
To
Wall

Publicité

Table des Matières
loading

Table des Matières