Installation Instructions - Bradley S59-2005 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Dimensional Information
Tub/Shower Installation
7"
(178)
3-1/4" (83) Max.
1/2" (13)
2-1/2" (64) Min.
NPT
1-1/2"
(38)
3-7/8" (98) Max. Depth
3-1/8" (79) Min. Depth

Installation Instructions

1
Rough-in
"Back-to-Back" Installation
See Step 2 for
required valve
adjustment and
"Back-to-Back"
installation.
Bradley • 215-1501 Rev. F; EN 12-03-009
40"
(1016)
72"
1/2" (13)
(1829)
NPT
12"
1-1/2"
(305)
(38)
1/2" NPT Plug
(not supplied)
32"
(813)
Hot
Standard
Install
Shower Only Installation
7"
(178)
3-1/4" (83) Max.
2-1/2" (64) Min.
24"
(610)
48"
(1219)
3-7/8" (98) Max. Depth
3-1/8" (79) Min. Depth
• Rough-in 1/2" NPT hot and cold water supply
Supplies
(supplied by installer).
Reversed
• For finished wall, make a 4-1/2" hole in the wall
where the shower handle is desired.
• For unfinished wall, use the rough-in shield as
a guide. Keep rough-in shield over valve when
finishing wall. The face of the rough-in shield
should fit flush with the finished wall. The rough-in
Cold
shield can either be secured to the valve using
the escutcheon screws or press-fit into place.
Front View
5"
(127)
72"
(1829)
Hot
6-1/2" (165)
w/ Stops
2-1/2" (64)
w/o Stops
10/10/2012
S59-2005T1
(mm)
Cold
3

Publicité

Table des Matières
loading

Table des Matières