STEP 7
For bottom utility power entry, install conduit fitting and tighten locknut. Use the
proper fitting for the corresponding conduit size. Verify that the fitting meets the
local code requirements.
STEP 8
Make all utility power and ground wire
hookups to terminal block and grounding lug
inside enclosure (wiring for North America
shown). Torque terminal block screws to 20 lb/
in.
NORTH AMERICAN POWER CONFIGURATIONS
Utility Input
L1 to GND (V)
240V Split-Phase
120V
208V 3-Phase
120V
NEVER CONNECT TO A HIGH-LEG OR STINGER LEG
Voltage must be 120 volts from each line to ground
10
L2 to GND (V)
L1 to L2 (V)
120V
240V
120V
208V
STEP 9
Install and fasten the electronics cover assembly to the enclosure using 6 screws.
Screws shall be torqued to a minimum 15 ft/lbs.
STEP 10
Attach front face to front of electronics cover by inserting latches into mounting
holes. Tighten captive screw on bottom of enclosure to secure cover.
11