Webasto TurboDX Guide D'installation page 8

Borne de recharge pour véhicules électriques
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 7
For bottom utility power entry, install conduit fitting and tighten locknut. Use the
proper fitting for the corresponding conduit size. Verify that the fitting meets the
local code requirements.
STEP 8
Make all utility power and ground wire
hookups to terminal block and grounding lug
inside enclosure (wiring for North America
shown). Torque terminal block screws to 20 lb/
in.
NORTH AMERICAN POWER CONFIGURATIONS
Utility Input
L1 to GND (V)
240V Split-Phase
120V
208V 3-Phase
120V
NEVER CONNECT TO A HIGH-LEG OR STINGER LEG
Voltage must be 120 volts from each line to ground
10
L2 to GND (V)
L1 to L2 (V)
120V
240V
120V
208V
STEP 9
Install and fasten the electronics cover assembly to the enclosure using 6 screws.
Screws shall be torqued to a minimum 15 ft/lbs.
STEP 10
Attach front face to front of electronics cover by inserting latches into mounting
holes. Tighten captive screw on bottom of enclosure to secure cover.
11

Publicité

Chapitres

Table des Matières
loading

Table des Matières