Webasto TurboDX Guide D'installation page 7

Borne de recharge pour véhicules électriques
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 3
Decide location of utility wiring entrance: bottom or rear entry. Use a hole saw
to create hole sized for the current level of the charge; follow dimple and groove
features on enclosure for hole location. Diameter of drilled holes will depend on
type and size of conduit fits used.
STEP 4
For pedestal installations, skip to Step 5.
Place charging station onto the wall and align the marked point with the top.
Using a T25 Torx bit, insert one mounting screw, with sealing washer, into the top
mounting hole and screw directly into wall.
Use level to straighten the charging station. Fix charging station to wall by drilling
the second mounting screw with sealing washer, through the bottom mounting
hole. Continue installation on Step 7.
8
TOP
MOUNTING
HOLE
BOTTOM
MOUNTING
HOLE
STEP 5
For installing wallbox onto a pedestal, use the dimensions shown to drill holes onto
face of pedestal.
3.25
8.90
.51
.88
STEP 6
For rear utility power entry, installation shall use a ½" NPT x 1-1/2" threaded pipe
nipple with three ½" sealing lock nuts and two ½" female grommets, as shown.
Make sure all fittings are properly tightened.
.20
.94
1/2" LOCK NUT
WITH GASKET
THREADED PIPE NIPPLE
1/2" NPT X 1-1/2"
1/2" FEMALE GROMMET
9

Publicité

Chapitres

Table des Matières
loading

Table des Matières