Télécharger Imprimer la page

Snapper PRO S120 Serie Instructions De Montage page 6

Pour le revendeur

Publicité

Les langues disponibles

Les langues disponibles

must be on the left side of the machine (as determined from
the operating position).
1. Unpack the roll bar and hardware from the box.
2. Make sure that no fuel lines, cables, or parts or the wire
harness are in the way of the roll bar pocket.
3. Have an assistant help you to lift the roll bar and place it
into the roll bar pockets.
4. Install the four (4) 1/2" bolts (B), and 1/2" washers (C)
through the roll bar and the frame of the unit and secure
in place with the 1/2" nylock flange nuts (D).
5. Tighten the installation hardware to 80 ft. lbs. (108 Nm) of
torque.
Folding Roll Bar Installation
If you are installing a folding roll bar onto your unit follow
these instructions:
Assemble the Roll Bar Retainer Pins
1. Unpack the roll bar and hardware from the box.
2. Lock the snap end (A, Figure 6) of the lanyard (B) through
the retainer pin handle (C) and snap together.
6
3. Install the lanyard anchor (D) onto the lanyard.
4. Install the hair pin (E) onto the loop end (F) of the lanyard
as shown in Figure 6.
Install the Roll Bar to the Unit
The roll bar assembly is installed in the roll bar pockets which
are part of the main frame of the unit and are located behind
the seat and in front of the engine on both sides of the unit.
1. Assemble the top loop (A, Figure 7) to the left upright
tube (B) and the right upright tube (C) by loosely installing
the 1/2 bolt (D), through the retainer pin assembly (E),
then through the hole in the top loop that is closest to the
rear of the machine, the upright tube, and then loosely
install the 1/2 side lock nut (F).
6
7
2. Fold the roll bar to the down position (A, Figure 8) and
lock in place using the retainer pins and hair pin clips (B).
8
3. Make sure that no fuel lines, cables, or parts of the wire
harness are in the way of the roll bar pockets.
4. From the bottom of the roll bar upright tube measure up
8" (G, Figure 7) and mark the distance with a marking tool
or a piece of tape. Repeat for other upright tube.
5. Install the roll bar into the roll bar pockets. The roll bar is
installed so that the safety decals are on the left side of
the machine (as determined from the operator's position)
facing towards the front of the machine. When the mark
you made is even with the top of the roll bar pocket, the
holes are close to being lined up. If necessary, use a
dead blow hammer and drift pin to assist in lining up the
holes in the roll bar with the holes in the roll bar pocket.
SnapperPro.com

Publicité

loading