Lateral File And Open Shelf Lateral Ganging Instructions - Steelcase TS Storage Directives D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

®
Lateral File & Open Shelf Lateral Ganging Instructions
Side-By-Side Ganging Open Shelf Lateral
1.
Align and level cabinets.
2.
Using tape attached to bottom pan, lift tape on
bottom pan to pull up and remove. If there is not
tape already attached, use masking tape.
3.
Remove the two (2) screws on each
side panel towards the back of the unit.
Then remove the side panels.
4.
Locate the Ganging Hardware Kit
(included) and drive the four (4) #10 x 1/2"
self-drilling phillips pan head screws
through the channel return flange.
Side-By-Side Ganging for Drawer Lateral
1.
Align and level cabinets.
2.
Remove lateral file drawers (see page 2).
3.
Locate the Ganging Hardware Kit
(included) and drive the four (4) #10 x 1/2"
self-drilling phillips pan head screws through
the channel return flange.
1/2"
2"
Pull Tape
to lift pan
Open Shelf
Lateral
1/2"
2"
Lateral
Ganging Hardware Kit
ITEM
#10 x 1/2" Self-Drilling Screw
1/4-20 x 3/8" Pan Head Screw
1/4-20 Nut
Back-To-Back Ganging Open Shelf
Lateral
1.
Align and level cabinets.
1/2"
2.
Drill four (4) 5/16" diameter holes
through back panel approximately 2"
from top and 1/2" in from inside edges.
3.
Locate the Ganging Hardware Kit
(included). Insert four (4) 1/4-20 pan
head screws, add nuts and tighten.
2"
Back-To-Back Ganging for Drawer
Lateral
1.
Align and level cabinets.
2.
Remove lateral file drawers (see
page 2).
1/2"
3.
Drill four (4) 5/16" diameter holes
through back panel approximately 2"
from top and 1/2" in from inside edges.
4.
Locate the Ganging Hardware Kit
(included). Insert four (4) 1/4-20 pan
head screws, add nuts and tighten.
5"
QTY
4
4
4
Page 12 of 57
P/N 939504734
Doc # 70305 Rev K

Publicité

Table des Matières
loading

Table des Matières