HUUM UKU GSM Instructions D'installation Et D'utilisation page 7

Console de commande pour poêle
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 131
Control panel UKU
With a wooden housing
Remove the back cover of UKU control panel to attach it to the wall.
Attach the back cover to the wall so that the upper edge of the
control panel is at eye level.
Connect the power cable with the screw terminal of the device.
Attach the device to the back cover that has been placed on the
wall. Secure it with screws from the sides.
With a plastic housing
Connect the power cable with the cable screws of UKU control panel.
Pull off the control panel control knob.
Attach the device with screws to the wall.
Replace the control knob to the control panel.
Main module
When installing inside the steam room, the enclosure should be
placed 10-50 cm above the floor.
Do not attach the main module to the ceiling or inclined surfaces.
Connect the cables of the UKU control panel, temperature
sensor and door switch through a cable gland to the enclosure
and main module, see figure.
Connect the power cable (230 V/400 V) of the control console
through the cable glands to the main module, see figure.
Door sensor
The door switch consists of two parts: a sensor and a magnet.
Connect the cable ends to the terminals of the sensor.
Secure the magnet to the door. It must allow the door to close
and pass directly by the doorpost.
Secure the sensor to the doorpost so that when the door closes,
the sensor and the magnet will be aligned. The maximum distance
between the parts of the door switch must be 5 mm when the
door is closed.
1
2
3
7

Publicité

Table des Matières
loading

Produits Connexes pour HUUM UKU GSM

Ce manuel est également adapté pour:

Uku wi-fiLocal local

Table des Matières