Toshiba MMW-AP0271LQ-E Manuel D'installation page 5

Masquer les pouces Voir aussi pour MMW-AP0271LQ-E:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 7
• To transport the hot water module, do not take hold of the bands
around the packing carton. You may injure yourself if the bands
should break.
• The hot water module has been designed to be fitted at floor level.
Installation
• Install the hot water module securely in a location where the base can
sustain the weight adequately. If the strength is not enough, the unit
may fall down resulting in injury.
• Follow the instructions in the Installation Manual to install the hot
water module. Failure to follow these instructions may cause the
product to fall down or topple over or give rise to noise, vibration,
water leakage or other trouble.
• Carry out the specified installation work to guard against the
possibility of earthquake. If the hot water module is not installed
appropriately, a unit may topple over or fall down, causing an
accident.
• If refrigerant gas has leaked during the installation work, ventilate the
room immediately. If the leaked refrigerant gas comes in contact with
fire, noxious gas may generate.
• Use forklift to carry in the hot water module units and use winch or
hoist at installation of them.
• Helmet must be worn to protect your head from falling objects.
Especially, when you work under an inspection opening, helmet must
be worn to protect your head from falling objects from the opening.
• The unit can be accessed from the service panel.
Refrigerant piping
• Install the refrigerant pipe securely during the installation work before
operating the hot water module. If the compressor is operated with
the valve open and without refrigerant pipe, the compressor sucks air
and the refrigeration cycles is over pressurized, which may cause a
injury.
• Tighten the flare nut with a torque wrench in the specified manner.
Excessive tighten of the flare nut may cause a crack in the flare nut
after a long period, which may result in refrigerant leakage.
• After the installation work, confirm that refrigerant gas does not leak.
If refrigerant gas leaks into the room and flows near a fire source,
such as a cooking range, noxious gas may be generated.
7-EN
• When the hot water module has been installed or relocated, follow the
instructions in the Installation Manual and purge the air completely so
that no gases other than the refrigerant will be mixed in the
refrigerating cycle. Failure to purge the air completely may cause the
hot water module to malfunction.
• Nitrogen gas must be used for the airtight test.
• The charge hose must be connected in such a way that it is not slack.
Water piping
• Do not install water pipes in a location that is susceptible to freezing.
Electrical wiring
• Only a qualified installer (*1) or qualified service person (*1) is
allowed to carry out the electrical work of the hot water module. Under
no circumstances must this work be done by an unqualified individual
since failure to carry out the work properly may result in electric
shocks and / or electrical leaks.
• To connect the electrical wires, repair the electrical parts or undertake
other electrical jobs, wear gloves to provide protection for electricians
and from heat, insulating shoes and clothing to provide protection
from electric shocks. Failure to wear this protective gear may result in
electric shocks.
• Use wiring that meets the specifications in the Installation Manual and
the stipulations in the local regulations and laws. Use of wiring which
does not meet the specifications may give rise to electric shocks,
electrical leakage, smoking and / or a fire.
• Connect earth wire. (Grounding work)
Incomplete grounding causes an electric shock.
• Do not connect earth wires to gas pipes, water pipes, and lightning
conductor or telephone earth wires.
• After completing the repair or relocation work, check that the earth
wires are connected properly.
• Install a circuit breaker that meets the specifications in the installation
manual and the stipulations in the local regulations and laws.
• Install the circuit breaker where it can be easily accessed by the
agent.
• When installing the circuit breaker outdoors, install one which is
designed to be used outdoors.
– 4 –
8-EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mmw-ap0561lq-e

Table des Matières