Télécharger Imprimer la page

Dell Networking C1048P Guide De Mise En Route page 27

Publicité

Les langues disponibles

Les langues disponibles

Configuring the Software
To complete the hardware installation, install the C1048P in a rack, attach an
uplink cable to a parent C9010 switch, (optionally) set up a stack of C1048P
port extenders, and power on the port extender.
To provision a C1048P, you can configure basic software settings from the
C9010 console either before or after you connect the C1048P to a C9010.
For example, you can pre-configure software settings to be downloaded from
the parent C9010 after you power on the C1048P. Provisioning pre-
configured C1048P settings is performed using a discovery and
authentication process through a port-channel interface on the C9010.
The C9010 port-channel interface enabled for PE communication consists of
member ports configured with the cascade port command. For more
information, see Provisioning a Port Extender.
Provisioning a Port Extender
You can provision a C1048P with an initial software configuration before or
after you install and power on the port extender. To provision a C1048P, start
from the C9010 console and enter the following commands. If you enter the
commands before you install the C1048P with a parent C9010, the pre-
configured software settings are downloaded to the C1048P as soon as you
attach it to a C9010 port and power up the C1048P.
NOTE: Although you can provision a C1048P before or after you install
and power on the port extender, Dell Networking recommends that you
pre-configure software provisioning before you install a C1048P and
then connect it to a pre-configured, cascaded C9010 port. In this way,
you can "plug and play" a C1048P with a parent C9010.
1.
Turn on support for port-extender configuration on a C9010.
CONFIGURATION mode
Dell(conf)# feature extended-bridge
2.
Enter Port-Extender configuration mode to pre-provision a C1048P.
CONFIGURATION mode
Dell(conf)# pe provision pe-id
25

Publicité

loading