Start Up Instructions - Garland 1190 QG Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50

6. START UP INSTRUCTIONS

6.1. UNPACKING AND LIST OF MATERIALS
Carefully inspect the product to ensure that there are
no damaged elements. If you find any damaged or
missing parts, do not use the machine until the defect
has been repaired or all the missing pieces replaced.
Using the machine without all of its parts or with
defective parts can cause severe personal injury.
6.2. ASSEMBLY
6.2.1. WHEEL INSTALATION
Lift the machine a little, and reeve the wheel with the
wheel shaft. Fix the nuts in a safety way.
6.2.2. DISCHARGE CHUTE INSTALLATION
Remove the shaft and lower the deflector.
Place the base with the recess forward and enter the
fi rst hole through the shaft, the baffl e holding the
Shaft
base and tighten the nuts. Then put the other screw
with the nut.
Deflector cap
Deflector
Place the defl ector cap by inserting it in the links at
the top and secure with screws and nut as shown in
the picture.
Deflector cup nuts
Nuts and screws
6.2.3. NOZZLE INSTALLATION
Place the nozzle as shown in the picture and fi x it
with the screws.
35/148
Base
Nozzle
English

Publicité

Table des Matières
loading

Table des Matières