Operations For Commissioning - MBM PLG74TG Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
GENERAL WARNINGS
Operators have a duty to fami-
liarise themselves adequately,
using this manual before per-
forming any intervention, adopting
the specific safety requirements to
make every kind of human-compu-
ter interaction safe.
Any technical modification that
affects the operation or safety
of the machine must only be
carried out by the technical person-
nel of the manufacturer or by techni-
cians that are formally authorised by
the manufacturer. Failure to do so
exempts the manufacturer from any
liability for for any possible resulting
modifications or damage.
Even after appropriate familia-
risation, upon the first use of
the appliance, in any case si-
mulate a number of test operations
to save more rapidly the main fun-
ctions of the appliance, e.g. start-up,
shut-down, etc.
The appliance is provided alrea-
dy tested by the manufacturer
and fitted with the type of gas
and electrical supply specified on the
rating plate applies.
In case of supply with LPG
gas (Butane or Propane) at 50
mbar,a pressure stabilizer 50 mbar
must be installed upstream of the
appliance.
FIRST COMMISSIONING
UP / Upon completion of the opera-
tions of positioning and connection to
the power sources, perform a series of
operations such as:
1. Cleaning away of the protective ma-
terials (oils, grease, silicones, etc.) insi-
de and outside of the cooking chamber
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.

OPERATIONS FOR COMMISSIONING

START
- 12 -
(see section 3 / Removal of protective
materials).
2. General checks and controls such as:
Check opening of switches & network
gate valves (e.g. water, electricity, gas
when applicable); Checking of drains;
Checking and monitoring of the exter-
nal fumes/vapour extraction; Checking
and monitoring of the protection panels
(all the panels must be fitted correctly).
PRESSURE DETECTION
GAS INLET
If the measured pressure is
lower than the 20% compared
to the nominal pressure (ex.
G20 20 mbar ≤ 17 mbar) suspend the
installation and contact the gas di-
stribution service.
If the measured pressure is hi-
gher than the 20% compared to
the nominal pressure (ex. G20
20 mbar ≤ 25 mbar) suspend the in-
stallation and contact the gas distri-
bution service.
The constructor firm does not
recognise the machines war-
ranty in case the gas pressure
is lower or higher than the values
above described.
Make sure there are no gas leaks
After controlling the pressure
and type of gas supply interven-
tion may be required, such as: 1.
Replacement of the nozzle (in the
case where the type of network gas is
different from that for which the ap-
pliance is preset- see chapter 6).
DESCRIPTION OF STOP MODES
Generally, in stoppage condi-
tions caused by faults and
emergencies, in the event of immi-
nent danger, it is mandatory to close
all the locking devices on the supply