Chapter 3 Installation; Bath Installation; Ventilation; Cover Installation - Thermo Scientific Precision Guide De Démarrage Rapide

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
3
Chapter 3
Installation
|

Chapter 3 Installation

Bath Installation

The bath is designed for continuous operation and for indoor use.
Never place the bath in a location where excessive heat, moisture or corrosive
CAUTION
materials are present.

Ventilation

No special ventilation clearances are required.

Cover Installation

Figure 3-1 – GP Bath Cover Installation
3-1
Thermo Scientific
Precision
|

Publicité

Table des Matières
loading

Table des Matières