Construction; Accessories; Unpacking - Hoshizaki FM-120KE-HC Notice D'installation

Masquer les pouces Voir aussi pour FM-120KE-HC:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9

1. CONSTRUCTION

Operation Panel
Front Panel (Left)

2. ACCESSORIES

CD
Inlet Hose
Outlet Hose
Adjustable Leg
Power Supply Cord
Connector Cover
Scoop

3. UNPACKING

Children should not be allowed in reach of the packaging elements (plastic bags and expanded polystyrene) as they are
potential sources of danger.
Do not lift or manoeuvre the carton by using the shipping bands.
When moving the unit by hand, remove the panels and hold the unit frame.
Always wear protective gloves when carrying the unit.
When handling the carton or the unpacked unit, work in pairs to prevent injury.
Remove shipping carton, tape(s) and packing. If packing material is left in the icemaker, it will not work properly.
1) After removing the packaging, make sure that the icemaker and the storage
bin are in good condition. If in doubt, please do not use the icemaker but
apply to professionally qualified personnel.
2) Remove the shipping tape holding the door and front panel (left).
3) Open the door and remove the package of accessories. Check the contents
according to "2. ACCESSORIES".
4) Remove the front panel (left) and top panel.
5) Remove the protective plastic film from the exterior. If the icemaker is
exposed to the sun or to heat, remove the film after the icemaker cools.
Louver
Air Filter
1
1
1
4
1
1
1
Inlet Hose
Top Panel
Scoop
CD
Outlet Hose
WARNING
CAUTION
NOTICE
3
ENGLISH
Storage Bin
Door
Front Cover
Power Supply Cord
Adjustable Leg
Connector Cover
Front Panel
(Left)
Top Panel:
Remove the screws and lift off.
Front Panel (Left): Remove the screws. Lift up
and pull toward you.
Top Panel

Publicité

Table des Matières
loading

Table des Matières