Pentair Raychem FROSTEX 9800 Directives D'installation Et Guide D'utilisation page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

step 3.
Install the 9800 FlexFit plug
Reset button
Test button
Ground-fault
unit
3A. prepare the cable
Cleanly cut off the end of the cable. Push
back the braid 3/4 in (2 cm) and then twist
the end of the braid around the cable to
ensure the braid strands are not sticking up.
Note: The clear plastic wrap does not
need to be removed.
3B. Insert the cable
Insert the heating cable all the way into the
cable guide until the cable hits the back wall.
Be sure no braid wire strands enter cable
guide.
THERMAL buiLding SOLuTiOnS
Indicator
light
3/4 in
(2 cm)
Back wall
EN-FrostexFreezeProtection-IM-H56581      12/14
Cable guide
Ground contact
3C. Complete the connection
Screw down the cable guide, alternating
between the two screws, until the cable
guide is flush with the indicator posts and
the screws bottom out.
3D. Install the cover
Install the cover by tightening the screws
completely.
Note: The screws will require many
turns before the cover starts to close.
Cover
Back wall
Indicator post
Indicator
post
6 / 10

Publicité

Chapitres

Table des Matières
loading

Table des Matières