B Appendix - Flamepath
The maximum constructional gap (ic) is less than that required by Table 2 of EN 60079-1:2007 as detailed below:
FLAMEPATH
1.
Between component drawings
BRT2MPXALBPAN e BRT2MPXTAPINF
2.
Between component drawings
BRT2MPXALBTP e BRT2MPXBUT
3.
Between component drawings
BRT2MPXALBTS e BRT2MPXBUT
4.
Between component drawings
BRT2MPXALWIP e BRT2MPXBUST
Tab. 13
MNVCMPXHD_1607_EN
MAXIMUM GAP (MM)
MINIMUM WIDTH (MM)
0.249
25.4
0.245
26.8
0.245
26.8
0.249
25.3
COMMENT
Cylindrical joint sup-
ported by bearings
Cylindrical joint sup-
ported by bearings
Cylindrical joint sup-
ported by bearings
Cylindrical joint sup-
ported by bearings
45