82
Chapter 2. Unpacking and First Operation
The moisture bottle is connected to the right connector (view from above) of the TM 235 KF. The waste (clear)
bottle is connected to the left connector.
Fig. 4
The PTFE tube from the clear waste bottle is adjusted to the ground (tube 1) of the titration vessel. The PTFE
tube from the solvent bottle (tube 2) is adjusted as shown in the next two pictures:
Fig. 5