INSTALLER FINAL CHECKLIST

14
US
CA
GENERAL
Placement of Unit.
Specified clearance maintained to cabinet surfaces.
Unit Level- front to back, side to side.
All packaging material and tie straps removed.
ELECTRICAL:
Receptacle with 15 ampere circuit protection is provided for service cord connection.
Adequate ground connection.
GAS SUPPLY:
Connection: 1/2" NPT flex line with a minimum 5/8" diameter.
The pressure regulator which is connected to the manifold is set for 4.0" W.C. for Natural Gas or
10" W.C. for LP.
Manual gas shut-off valve installed in an accessible location.
Unit tested and free of gas leaks.
OPERATION:
All internal packing materials are removed, ie below grates, around knobs, etc.
Knobs turn freely and correctly.
Each burner lights satisfactorily, both individually and with other burners operating.
Low flame operation verified.
All burner caps, burner rings and burner bases correctly seated in position, level, and do not rock or slide.
Burner grates correctly positioned, level, and do not rock.