Installer Checklist - Fisher & Paykel DCS BGC Serie Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

INSTALLER CHECKLIST

Specified clearances maintained to combustibles.
n
Side burner is properly mounted.
n
All internal packaging removed.
n
Burner is seated properly and does not rock.
n
Each burner lights satisfactorily, individually or with adjacent burner lit.
n
Knob(s) turn freely. Bezel(s) centered.
n
Flame adjusted.
n
Pressure regulator connected and set for 4.0"W.C. Natural, 11"W.C. LP gas.
n
Manual shut-off valve installed and accessible.
n
Unit tested and free of leaks.
n
User informed of gas supply shut-off valve location.
n
Battery installed in module properly and generates ignition spark when activated.
n
PLEASE LEAVE THESE INSTRUCTIONS WITH THE USER.
USER, PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
15

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Dcs bgc131Dcs bgc132Dcs bgc131-biDcs bgc132-bi

Table des Matières