Installer Checklist - Fisher & Paykel DCS Evolution BE Serie Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installer Checklist

Specified clearances
maintained to
combustibles
Verified proper enclosure
ventilation
All internal packaging
and any adhesive residue
removed. To remove
stubborn residue, use
rubbing alcohol or a
commercially available
adhesive remover
Removed shipping bracket
Knobs turn freely, bezels
centered
Halo lighting is functioning
correctly
Each burner lights
satisfactorily - individually
or with adjacent burner lit
Contact DCS at www.dcsappliances.com if any of the listed items are missing. Please be prepared
with your Model #, Serial # and description of item(s) that are missing.
IMPORTANT!
Read all installation instructions in this manual to see if the unit has been correctly installed. Ensure
that installation has been completed correctly before use.
22
INSTALLATION
Air shutters adjusted
Low flame setting
satisfactory
Drip pan in place properly
and sliding freely
Pressure regulator
connected and set for 4.0"
C.E. Natural, 11.0" C.E. LP
gas
Manual shut-off valve
installed and accessible
Unit tested and free of
leaks
User informed of gas
supply shut-off valve
location
All radiant trays are
assembled and put in place
Check match lighting
Internal lighting is
functioning correctly
Transformer is tidy and
mounted securely, in a
suitable location
Please leave these
instructions with the user.
User, please retain these
instructions for future
reference.
Tag location of
Model # and Serial #

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Dcs evolution be1-48rDcs evolution be1-36r

Table des Matières