INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
5.4 REPLACEMENT OF THE COUPLING JAW
ATTENTION: Make sure that the coupling is closed, ie. the coupling pin
(14) is down.
1)
Remove the 3 screws (21) keeping the washers, remove the mechanism unit
(20a) and the coupling pin (14);
Remove the 3 screws (12d), plate (12c), spring (12b) and circlip (10c);
2)
3)
Move the jaw (13) downwards and remove it (see chapter 7 DISPOSAL, page
30/32);
4)
Place the new jaw (13) in to position, fit the circlip (10c), spring (12b) and plate
(12c);
5)
Tighten the screws (12d) to torque M = 50 Nm using Loctite 243;
6)
Fit the coupling pin (14) and the mechanism unit (20a) (see point 3 in chapter
5.2 REPLACEMENT OF THE MECHANISM UNIT AND THE COUPLING PIN, page
22/32).
DRAWBAR COUPLING E 40
Wear working gloves and heavy working shoes
20a
14
10c
12b
12c
12d
PAG.
24/32
CHAP . 5
REV. 00
13