INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
8 HOW TO TAKE THE COUPLING OUT OF SERVICE
This chapter refers to the figure on page 21/32.
1)
Remove the nut cover (1), split pin (2) and the castellated nut (3);
2)
Remove the rear flange (4) and the rubber buffer (8a) and the
second rear flange (5a);
3)
Remove the tie rod (25) from the coupling flange (7a), remove the
front flange (5b) and the rubber buffer (8b);
4)
Remove the bolts (24) and the coupling flange (7a);
5)
Lubricate the metallic parts with a thin layer of oil and keep the
coupling in a case strong enough.
DRAWBAR COUPLING E 40
PAG.
31/32
CHAP . 8
REV. 00