TOOL OPERATION -
continued
Loading of Nails
Step 1 - Grasp the handle firmly.
Step 2 - Insert one or two strips of nails into the rear
of the magazine.
Step 3 - Pull the follower to the rear of the magazine
until it is engaged behind the nails.
Sequential Operation - (Silver Trigger)
The tool is manufactured with a (Silver) sequential
trigger installed.
The sequential operating trigger prevents successive
or "bounce" driving.
Depress the work contacting element and hold it
■
against the work surface before pulling the trigger.
After each fastener is driven, completely release
■
the trigger and lift the tool from the work surface.
Sequential Lever
Grommet
Sequential
Actuator
Trigger Pin
#501039
Sequential
Trigger
Contact Trip (Bounce) Trigger Operation
(Orange Trigger)
The trigger kit (#501048) allows successive or
"bounce" driving.
Bottom Trip Lever
Grommet
Precision Placement Driving
Grasp the tool handle firmly and place the bottom of the
■
work contacting element firmly against the workpiece until
it is completely depressed.
Squeeze the trigger to drive the fastener.
■
Lift the tool from the workpiece.
■
Repeat the procedure for the next fastener.
■
Successive (Bounce) Driving
Grasp the handle firmly.
■
Squeeze the trigger and move the tool along the work-
■
piece with a bouncing motion, depressing the work contacting
element at the points where you want to insert a fastener.
Keep the trigger depressed and continue to bounce the
■
work contacing element against the workpiece, positioning
the tool above as carefully as possible.
When the desired number of fasteners have been driven,
■
release the tool trigger to avoid unintentional fastener discharge.
Do not clamp or hold the trigger with
anything other than your hand.
6
Contact
Trigger
Trigger Pin
#501048
WARNING