Operating Elements; Camera; Monitor; Start-Up - Conrad 75 10 59 Mode D'emploi

Set de surveillance tft à 2 canaux
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Operating elements

A) Camera
1a rain protection enclosure
2a infrared illumination (automatic switch-on at dark)
3a bracket
4a DIN
B) Monitor
1b channel display (LED)
2b adjustment button "VOL +"
3b adjustment button "VOL -"
4b function button (for OSD) "FUNC"
5b mirror function "REV"
6b "ON/OFF" button
7b channel selector "CH"
8b "A/V OUTPUT"

7. Start-up

In order to ensure a proper start-up, read through these operating instructions with the safety information completely
and attentively before use.
In selecting the installation location of your set, make sure that direct, intense sunlight, vibrations, dust, heat, cold
and moisture are avoided. Direct sunlight or bright illumination, etc., could strongly influence the camera image and
make watching the image difficult.
There should be no device with strong electrical fields near the cameras / control unit, e.g., cell phone, wireless
equipment, electrical motor, etc. They could negatively influence functioning. Before mounting, test the distance
between the cameras and the control unit.
A) Camera installation
Make absolutely sure that no electrical cables or conduits are damaged when drilling the attachment
holes.
1.
Choose a suitable mounting location for the area to be monitored, with suitable mounting subsurface. A vertical position is
preferable, but not a precondition. The screen has a special mirror function by means of which the image orientation can be
adjusted. The camera can also be attached to ceilings.
2.
Mark out attachment holes using the camera bracket as template on the subsurface chosen and drill them sufficiently deep.
Use the anchor fittings provided for massive walls. With other materials (wood, metal, etc.), make sure that there is sufficient
firmness of the supporting subsurface; if necessary, get special anchor fittings (e.g., with plasterboard).
3.
Now attach the camera on the bracket and locate it in position by tightening. Make sure that cables are not crushed or
damaged.
4.
Bolt the whole camera bracket down onto the subsurface by means of the screws and a Phillips screwdriver. Then adjust the
camera on the universal joint as desired and locate it in position with the wing bolt.
5.
Repeat these steps when installing the second camera. Make sure not to install the two cameras too far from the location of
the monitor, so that the length of the transmission cables (ca. 18 m each) is sufficient.
16
5a microphone
6a camera bracket (with two universal joints)
7a 18 m DIN to RCA cable
9b fold-out stand
10b input camera 2
11b input camera 1
12b power input jack (DC)
13b A/V cable
14b RCA cable
15b power adapter

Publicité

Table des Matières
loading

Table des Matières