ENGLISH
1) INSTALLATION INSTRUCTIONS
2) Universal mechanical framework
3) PRECAUTIONS FOR USE (The product guarantee depends on the respect for these rules)
INSTALLATION and START UP
For products delivered with filters, these must be installed in accordance with the instructions.
Before commissioning any of our valves, it is essential to carefully drain
the pipes that can damage the mechanisms or water passages (PRESTO® heads that can be dismantled from front).
Recommended operating pressure according to NF EN 816: 1 to 5 bars.
CLEANING
The chrome-plated coating of PRESTO® valves must be cleaned only with soapy water.
Abrasive, acid, alkaline or ammonia-based household products are prohibited.
4) Universal tank framework for 3-6 litre mechanical control Part no. 18587
5) Technical characteristics:
- NF self-supporting framework, width 300 x height 1120 x depth 190 made of 40 x 50 steel section.
- 3/6 litre anti-condensation tank with mechanical control
- Equipped with a double volume valve, a male G1/2" shut-off valve and an NF float valve class 1 quiet.
- Adaptable drain pipe for vertical or horizontal PVC output with a diameter of 100mm, depth adjustable over 60 mm
and drain sleeve WC Ø 90/100.
- Ø.40 bowl tank-tube with Ø 55 lip seal for bowl.
- Adjustable wall attachments.
- Complete bolting, 12 x 200 threaded rods and nut cover.
- With or without control plate (according to references)
6) Packing:
- Packing may be made of gypsum board, cellular concrete, marine fibre board or other materials; it may also then be
tiled, decorated or coated, etc.
- The recommended minimum thickness is 26mm (2 x BA 13 plates).
The packing can be fitted to the entire height of the part or up to the frame height to cover an edge.
- Accessibility for maintenance either via the upper shelf or the pipe gallery.
7) Adjustable metal wall attachments
8) Feed
9) Section 40x50
10) Bowl 400 from the finished floor
11) Minimum 1120mm - Maximum 1270mm
1120 for bowl 400 from the finished floor
1220 for bowl 500 from the finished floor
12) Drain pipe adjustment
13) 100mm PVC pipe to be bonded
14) Finished floor
15) Fitting and adjusting the framework
16) drill bit Ø10
17) Vertical output
18) Horizontal output
19) Fitting the bowl
20) Tank
21) 1 - 1/2" female shut-off valve and copper + nut
2 - Float valve
3 - Float valve attachment clips
4 - Emptying mechanical valve
6 - Tank and counter plate attachments
7 - Control plate
8 - Cover
9) Property plate
10- Embedding tube
22) Water inlet connection
23) Connecting the water inlet to female ½ stop valve
25) Maintenance
26) Remove the plate
27) Unscrew the control screw and the counter plate screws
28) Push
29) Pull
30) Unscrew the anti-vandalism screw
31) Removing the mechanical control plate
32) Removing the valve and changing the seal
33) Mechanism membrane (x5) Part no. 90786
34) Emptying mechanism Part no. 90789
35) Removing the float valve
36) Unclip the float valve
37) Close the shut-off valve
38) Unscrew the copper nozzle
39) Float valve Part no. 90787
40) Float valve membrane (x5) Part no. 90788
41) This document is not contractual; we reserve the right to modify the characteristics of our products without notice.
42) PATENTED and REGISTERED MODELS