IntelliChlor "Dummy" Cell

After new pool construction has been completed, in order to prevent debris from entering the IntelliChlor
Electronic Chlorine Generator, it is recommended that the IntelliChlor Electronic Chlorine Generator
"dummy" cell (P/N 520588) be installed before installing the IntelliChlor Electronic Chlorine Generator.
After the pool system has flushed the debris from the pipes, remove the "dummy cell" and install the
IntelliChlor Electronic Chlorine Generator.
Selecting Model Size
IntelliChlor Model IC15
Chlorine Production: The equivalent of 0.60 pounds (272 g) of pure chlorine per 24 hour period of pool
pool pump run time.
Residential Pools: One unit per 15,000 gallons (56,800 liters)
IntelliChlor Model IC20
Chlorine Production: The equivalent of 0.70 pounds (317 g) of pure chlorine per 24 hour period of pool
pool pump run time.
Residential Pools: One unit per 20,000 gallons (75,000 liters)
IntelliChlor Model IC40
Chlorine Production: The equivalent of 1.40 pounds (635 g) of pure chlorine per 24 hour period of pool
pump run time.
Residential Pools: One unit per 40,000 gallons (150,000 liters)

Installing the IntelliChlor Cell Assembly

Install the IntelliChlor cell assembly no closer than three (3) feet away from the heater outlet, if used. For
more information see plumbing diagrams on page 4 and 5.
Note: For best flow sensing, provide at least 12"-18" of straight pipe in front of the cell inlet.
Note: After new pool construction has been completed, in order to prevent debris from entering the
IntelliChlor cell assembly, it is recommended that the IntelliChlor pass-through cell (P/N 520588) be
installed before installing the IntelliChlor cell. After the pool system has flushed the debris from the
pipes, remove the pass-through cell and install the IntelliChlor cell.
Note: Pipe couplings: Schedule 80, maximum pressure 75 psi at 70° F (21° C)
Coupling
IntelliChlor Electronic Chlorine Generator Installation and User's Guide
Coupling