Wasserlab Micromatic Mode D'emploi page 15

Masquer les pouces Voir aussi pour Micromatic:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Follow the instructions in Section 11.2 Installation or replacement of the resin cartridges [3] and [4]
7.3.4 Equipment start-up
After making the hydraulic connections and installing the switch level (Section 7.3.1), installing the pretreatment (Section
7.3.2), and installing the deionization resin cartridges (Section 7.3.3), start-up the equipment taking the following steps:
-
Open the feed water shut-off valve and check that there are no water leaks at the connections made or from
the inside of the equipment.
-
Connect the equipment to the electrical network.
o
First connect the transformer to the equipment.
o
Then connect the transformer to the electrical network. The equipment will start automatically.
-
Leave the equipment in operation. The equipment will go into Production mode until the tank gets full (See
Production in Chapter 9).
-
Once the tank is full, the equipment will switch to stand-by mode (See Stand-by in Chapter 9).
-
Check that the water dispensation is done properly (see Water Dispensation in Chapter 9).
15/31

Publicité

Table des Matières
loading

Produits Connexes pour Wasserlab Micromatic

Ce manuel est également adapté pour:

M25da25qq

Table des Matières