Wasserlab Micromatic Mode D'emploi page 14

Masquer les pouces Voir aussi pour Micromatic:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The hydraulic connections of the equipment are illustrated in Chapter 8. Take the following steps to perform the
hydraulic connections:
Water supply:
The water supply shall be provided with a shut-off valve with a 3/8" male threaded gas terminal. The shut-off valve must
be easily accessible in case the water supply needs to be interrupted.
The connecting piece supplied (Figure 7.2) is screwed into the male 3/8" terminal.
Do not use Teflon for this connection (the connection piece is provided with a rubber gasket).
IMPORTANTE! The shut-off valve must be closed during installation.
Connection [IN] of the equipment:
Tube from water supply to connection [In] on the back of equipment.
Connection [TANK] of the equipment:
Tube from connection [TANK] on the back of equipment to tank
Connection [Rej] of the equipment:
Tube from connection [Rej] on the back of equipment to a drainage point to collect the rejected water. The drainage
point must be located at a maximum distance of 3 m. Make sure the tube stays in place by means of a drain flange
(provided by the manufacturer) or by inserting the tube about 30 cm into the drain pipe.
Installation of the drain flange:
-
Drill a 6.5 mm hole on the drain pipe where the rejection tube needs to be inserted (Figure 7.2).
-
Place the pad and the drain flange over the hole, gripping the pipe. Secure it by tightening the screws on both
sides of the flange (Figure 7.3).
-
Insert the rejection tube 5 cm. Secure the rejection tube with the drain flange nut (Figure 7.4).
Figure 7.2
Connection [Type II] of the equipment:
The switch level must be installed in the tank. The switch level is electrically connected to the level cable from the [Type
II] connection on the back of the equipment. The type of switch level will depend on the installed tank.
If the water storage tank is not supplied, a switch level is supplied to be installed in the user´s deposit of choice.
To place it, drill two holes of 16 mm outer diameter to place the switch level fitting and the Type II water inlet tube. The
switch level must be positioned upright.
Level
l
Connection [Bot] of the equipment:
Not used
7.3.2 Install the pretreatment cartridges [1] and [2]
Follow the instructions in Section 11.1 Installation or replacement of the pretreatment cartridges [1] and [2]
7.3.3 Install the resin cartridges [3] and [4]
Figure 7.3
Type II water
l
Figure 7.2
Figure 7.4
14/31

Publicité

Table des Matières
loading

Produits Connexes pour Wasserlab Micromatic

Ce manuel est également adapté pour:

M25da25qq

Table des Matières